Pacific Urethanes Partners with Prime Resins Inc.
A pump pit at Quakers Hill Wastewater Treatment Plant in Sydney was designed to have rainwater flow to a sump pump in one corner. The other corner of the pit settled allowing water to pool there instead of flowing to the sump.
Prior to lifting the sunken corner with Precision Lift No 4.0, the weak substrate under the whole pit was strengthened and voids were filled with Prime Flex 920 structural polyurethane foam. The materials were manufactured at Pacific Urethanes facility in Melbourne.
By partnering with Pacific Urethanes in Australia Prime Resins was able to offer greatly reduced lead times and a rapid response service to their customers.
Prime Resins Inc. was established in Atlanta Georgia in 1982 to develop, supply and install a range of Polyurethane systems to repair cracks in concrete structures and to stop water ingress. Prime Resins has continued to develop systems for ground consolidation and the stabilization and lifting of concrete floor slabs